Please Note: Due to the large volume of content on this website,there are some pages that use automatic translation software to translate from the original Japanese to English.This may result in some grammatical and spelling mistakes.However, Xcream assures you these mistakes are not a reflection of the top-quality products you will find on this site.

Example of the Auger Rod failure

パッケージ画像(大)
パッケージ画像
Product number: SA-20
Genre: Architecture
Dealers: 想アーキテクツ

Please select the distribution format

120JPY (Including tax)
ご購入前にご確認ください≫ インターネット環境について
お気に入り登録
サンプルファイルをダウンロード

File List:無期限視聴、スマートフォン(iPhone,Android)・iPad視聴可

TypeSizeImage qualityReplay timeDRMStreamingDownload
mp4 24.85MB 2,100kbps
1 minute, 35 seconds
None impossible possible

Product Information

Problems that plague the field in pile construction is underground obstacles, such as on a Boulder.

Contains the corruption examples of Rod seemed bored pile PHC with this content per vibration occurring in construction by pre-boring process on a large Boulder, and a long continuous load operations. Describes waveform feature hit the underground obstacles and the correlation integral current value and N value of the other.